Black Fern LLC  ·  Dan Schaffer  ·  Atlanta, GA

Your plant can do more.
You already know it.

Production is behind plan. Overtime is covering the gap. The last improvement effort didn't hold. I embed with your existing team, find the constraint that limits your plant, fix it, and coach your people so the gains hold after I leave. Most engagements require little or no capital.

$150M+
Cumulative EBITDA benefits
25–150%
Production increases
60+
Global engagements
30 yrs
Manufacturing operations
Tell Me What's Stuck See the Results

Engaged directly by manufacturers and through advisory firms including Crowe, Proudfoot, Synergetics, and Tri-Vista.

Sound Familiar?

Three different seats.
The same plant floor.

01 — PE Sponsors & Boards

“We acquired this plant to increase performance. We're not seeing it yet.”

What changes

Production and EBITDA catch up to the investment thesis, backed by data a buyer will trust. Post-acquisition improvement, carve-outs, and pre-exit value creation.

02 — Advisory Firms

“We won the project. Now we need someone on the floor who gets results and keeps the client happy.”

What changes

A senior operator deployed solo or alongside your team. The same firms keep bringing me back. That's the proof.

03 — Manufacturers

“We live on overtime. My supervisors still come to me for every decision.”

What changes

A team that owns its numbers and runs the plant without you standing over them. The same resource advisory firms deploy, available directly.

The one nobody says out loud “My managers are working hard, and we still miss the numbers. I can't see why.” It's usually the system →

What Changes

Results that last
after I leave.

Not a report. Measurable changes in how your plant runs, delivered by your own people.

Two shifts and heavy overtime
Production doubled on one shift, overtime cut 50%
Steel fabrication
$38M in annual sales
$96M in annual sales, EBITDA up more than 100%
Steel & aluminum
3 units a week and no shared view of the problem
7 units a week, once everyone worked from the same data
Equipment enclosures
A capital request on the table
50% more production, zero capital
Chemical processing

Selected engagements. Client names kept confidential; industry and results only.

Steel Fabrication · PE-Owned · Board Appointment
Production doubled, $20M in added revenue capacity
Eliminated the second shift, cut overtime 50%, and reduced WIP scrap 90%. Real-time performance metrics kept the gains in place.
Steel & Aluminum Fabrication · PE-Owned · Presidential Appointment
150% production increase, about $58M in new annual sales
Annual sales grew from $38M to $96M. EBITDA up more than 100%. Lead times cut 30%.
Steel Enclosures · Caterpillar Supplier · PE-Owned
From 3 to 7 units a week
Kanban parts tracking, defined work cells, and combined shifts. Early pushback gave way once leadership worked from the same data.
Medical Device · Heart Catheters · PE-Owned
Post-merger integration, 35% more production from the line
Value stream mapped the fabrication and packaging lines. Better equipment utilization cut costs within 90 days.
Plastics & Resins · Public Company · 5 Countries
About $8M in annual savings across international plants
Production up 48% in China, 43% in Indonesia, and 16% in Germany. Coached supervisors on three continents.
Chemical & Fertilizer · PE-Owned
50% immediate production increase, zero capital
Reactor modifications and Lean workflow redesign. Baseline productivity held 35% higher.
Heavy Industry · Koch Industries Plant
$4.5M in annual savings, zero capital
Regression modeling of historical plant data showed what really drives energy use. No new equipment needed.
Cumulative EBITDA benefits
$150M+
Across 60+ global engagements
Production increases
25–150%
Without proportional headcount increases
Typical EBITDA impact, PE-owned companies
50–100%+
Per engagement
WIP inventory recovered
$9M+
Single solder alloy engagement
Facility consolidation ROI
10 to 1
Precision manufacturing carve-out
No-capital energy savings
$4.5M
Koch Industries plant

How We Get There

Map it. Fix it.
Make it last.

I don't write a report and leave. I map two things, the process and the management system that runs it, then work alongside your team to fix both.

01

Map it

Find the real constraint

A process operational map combines block flow mapping with Lean value stream mapping to trace every step from raw material to finished product, using up to three years of your own plant data. I also map your management operating system: the meetings, metrics, roles, and routines your leaders use to run the plant.

  • Theory of Constraints: find the one step that limits the whole plant
  • Management operating system: where it sets leaders up to succeed or fail
  • Based on your data, with capital and no-capital options sized first
02

Fix it

With the people you already have

We fix the constraint first, and rebuild the management routines around it. Most gains come from better flow and better systems, not new machines.

  • Lean flow, work cell redesign, and people productivity
  • Lower energy bills, often paid through a contingency gain-share
  • Little or no money spent on equipment
03

Make it last

Your team owns it

Frontline teams get clear goals for every shift, broken into short intervals. They see actual against goal as the shift runs, so they can fix problems in the moment instead of reading about them in next week's report.

  • Goals set with the team, not handed down
  • Actionable insight at the front line, every hour
  • Coaching for executives, plant managers, and supervisors
  • Accountability through transparency, not authority

What I help with

Lean Six Sigma Master Black Belt · 12+ countries · 30 years in plants

M&A integration & carve-outs

Facility consolidation and equipment relocation, on time and on budget.

Production & capacity

Clearing bottlenecks without adding proportional headcount or capital.

Executive & supervisor coaching

Building accountability habits that last after I'm gone.

Lean and Six Sigma

Mapping the work, cutting waste, and redesigning work areas.

Energy cost reduction

Regression-based baselines and zero-capital savings.

Plants worldwide

North America, Europe, Asia, and the Middle East.

Why It Lasts

Accountability through transparency, not authority.

“Leaders follow the system they're given. Fix the system, and they succeed.”

I never drive change by giving orders. I give the people closest to the work clear goals and the information to act on them, then coach them to use it. When people understand the why, they take ownership and improve performance themselves. When performance falls short, I look at the management system before the people in it. Most leaders are doing exactly what their system asks of them. Give them the right system, and they succeed.

01

Set the goal

Clear production targets for each shift and each hour, set with the team so everyone knows what good looks like.

02

See the gap

Actual against goal, posted at the front line and updated through the shift. Problems show up in minutes, not days.

03

Act in the moment

Operators and supervisors fix the cause while the shift is still running, and every miss becomes a lesson for the next one.

Get in Touch

Tell me what's holding
your plant back.

PE sponsor, advisory firm, or manufacturer, start with the problem. We'll know quickly whether I'm the right fit.

dschaffer@black-fern.com
Send a Message